Basics
Condition
Interior Color
Exterior Color
Drivetrain
Transmission
Fuel
Engine
VIN
Stock Number
Odometer Reading
Features
Exterior
Alloy Wheels
Safety
Brake Assist
Stability Control
Backup Camera
Convenience
USB Port
Keyless Start
Power Liftgate
Tow Hooks
HomeLink
Features
- 000 Miles Limited Powertrain Warranty
- 10 Year/100
- 114 Point Inspection!
- 115v Auxiliary Power Outlet
- 1st and 2nd row curtain head airbags
- 2 USB ports
- 3.45 Rear Axle Ratio
- 4 Door
- 4 X 4!
- 4-Wheel Disc Brakes
- 4-wheel ABS Brakes
- 6 Speakers
- ABS Brakes
- ABS and Driveline Traction Control
- AM/FM Radio
- AM/FM/Satellite-prep Radio
- Air Conditioning
- Alloy Wheels
- And Pittsburgh!
- Android Auto
- Anti-Whiplash Front Head Restraints
- Apple CarPlay/Android Auto mirroring
- Apple Carplay
- Apple Carplay/Android Auto
- Audio controls on steering wheel
- Auto-Dimming Rear-View Mirror
- Automatic Temperature Control
- Automatic front air conditioning
- Auxilliary engine cooler
- Blue-Accent Badges
- Bluetooth Connectivity!
- Body-colored bumpers
- Body-colored grille w/chrome accents
- Brake Assist
- Braking Assist
- Bridgeport
- Bucket front seats
- Bumpers: Body-Color
- Cargo Compartment Cover
- Cargo area light
- Cargo tie downs
- Center Console: Full with covered storage
- Clarksburg
- Clock: In-radio display
- Cloth Bucket Seats
- Cloth seat upholstery
- Coil front spring
- Coil rear spring
- Compass
- Cruise Control!
- Cruise control
- Cruise controls on steering wheel
- Cupholders: Front and rear
- Curb weight: 4
- 625 lbs.
- Dark Day Light Opening Moldings
- Dark Headlamp Bezel Finish
- Dark Lens Taillamps
- Daytime running lights
- Delay-Off Headlights
- Diameter of tires: 17.0"
- Digital Audio Input
- Door pockets: Driver
- passenger and rear
- Door reinforcement: Side-impact door beam
- Driver Door Bin
- Driver Seat Head Restraint Whiplash Protection
- Driver Vanity Mirror
- Driver airbag
- Driver knee airbags
- Dual Front Impact Airbags
- Dual Front Side Impact Airbags
- Dual front air conditioning zones
- Dual illuminated vanity mirrors
- Dusk sensing headlights
- Electronic Stability Control
- Elkins
- Engine immobilizer
- External temperature display
- Fairmont
- Floor mats: Carpet front and rear
- Fog Lamps!
- Fold forward seatback rear seats
- Four Wheel Independent Suspension
- Four-wheel Independent Suspension
- Free Carfax Report!
- Front Anti-Roll Bar
- Front Bucket Seats
- Front Center Armrest W/Storage
- Front Dual Zone A/C
- Front Fog Lights
- Front Head Room: 39.9"
- Front Hip Room: 57.0"
- Front Leg Room: 40.3"
- Front License Plate Bracket
- Front Reading Lights
- Front Shoulder Room: 58.7"
- Front Stabilizer Bar : Bar
- Front Ventilated disc brakes
- Front and rear reading lights
- Front and rear suspension stabilizer bars
- Front fog/driving lights
- Fuel Capacity: 24.6 gal.
- Fuel Consumption: City: 18 mpg
- Fuel Consumption: Highway: 25 mpg
- Fuel Type: Regular unleaded
- Fully Automatic Headlights
- Gloss Black Exterior Accents
- Gloss Black Grille W/Black Honeycomb
- Gloss Black Rear Fascia Applique
- Gloss Black Roof Rails
- Google Android Auto
- Gross vehicle weight: 6
- 500 lbs.
- Halogen Reflector Headlights
- Head Restraint Whiplash Protection with Passenger Seat
- Headlights off auto delay
- Heated Door Mirrors
- Heated driver mirror
- Heated passenger mirror
- Hill Descent Control
- Illuminated Entry
- Independent front suspension classification
- Independent rear suspension
- Instrumentation: Low fuel level
- Integrated Voice Command W/Bluetooth
- Integrated roof antenna
- Interior air filtration
- Jeep Black Gloss Badging
- Keyless ignition w/ push button start & keyless door entry
- Knee Airbag
- Leather Shift Knob
- Leather/metal-look shift knob trim
- Leather/metal-look steering wheel trim
- Left rear passenger door type: Conventional
- Liquid Titanium Accents
- Low Tire Pressure Warning
- Manual child safety locks
- Manufacturer's 0-60mph acceleration time (seconds): 7.2 s
- Max cargo capacity: 68 cu.ft.
- Metal-look center console trim
- Morgantown
- Multi-link rear suspension
- Normal Duty Suspension
- Occupant Sensing Airbag
- Outside Temperature Display
- Overall Length: 189.8"
- Overall Width: 76.5"
- Overall height: 69.3"
- Overhead Airbag
- Overhead Console
- Overhead console: Mini with storage
- Panic Alarm
- ParkSense with Stop rear reverse sensing system
- Parkview Rear Back-Up Camera
- Passenger Airbag
- Passenger Door Bin
- Passenger Vanity Mirror
- Permanent locking hubs
- Power 4-Way Driver Lumbar Adjust
- Power 8-Way Driver/Manual Passenger Seat
- Power Door Mirrors
- Power Liftgate
- Power Steering
- Power remote driver mirror adjustment
- Power remote passenger mirror adjustment
- Power windows
- Privacy glass: Deep
- Proudly Serving Grafton
- Quadra-Trac II 4WD System
- Quick Order Package 2bc Upland
- Radio Data System
- Radio: Uconnect 4 W/7 Display
- Rear Anti-Roll Bar
- Rear Collision Mitigation
- Rear Fascia Black Mic Step Pad
- Rear Head Room: 39.2"
- Rear Hip Room: 56.2"
- Rear Leg Room: 38.6"
- Rear Reading Lights
- Rear Seat Center Armrest
- Rear Shoulder Room: 58.0"
- Rear Stabilizer Bar : Bar
- Rear View Camera
- Rear Window Defroster
- Rear Window Wiper
- Rear center seatbelt: 3-point belt
- Rear door type: Liftgate
- Rear quarter windows: Wiper park
- Rear seats center armrest
- Rear spoiler: Lip
- Rearview Camera!
- Remote Keyless Entry
- Remote activated exterior entry lights
- Remote power door locks
- Right rear passenger door type: Conventional
- Seatback storage: 2
- Seatbelt pretensioners: Front
- Security & Convenience Group
- Security Alarm
- Selec-Terrain System
- Short and long arm front suspension
- Side airbag
- Silver aluminum rims
- Simulated wood door trim
- Simulated wood/metal-look dash trim
- SiriusXM Satellite Radio
- Spare Tire Mount Location: Inside under cargo
- Speed Control
- Speed Sensitive Audio Volume Control
- Speed-Sensing Steering
- Speed-Sensitive Wipers
- Speed-proportional electric power steering
- Split Folding Rear Seat
- Split rear bench
- Spoiler
- Stability controll with anti-roll
- Steel spare wheel rim
- Steering Wheel Mounted Audio Controls
- Suspension class: Regular
- Tachometer
- Telescoping Steering Wheel
- Three 12V DC power outlets
- Tilt Steering Wheel
- Tilt and telescopic steering wheel
- Tire Pressure Monitoring System: Tire specific
- Tires: Prefix: P
- Tires: Profile: 70
- Tires: Speed Rating: S
- Tires: Width: 245 mm
- Total Number of Speakers: 6
- Tow Hooks
- Traction Control
- Transmission hill holder
- Trip computer
- Type of tires: AT
- UConnect w/Bluetooth wireless phone connectivity
- Uconnect
- Universal Garage Door Opener
- Variable intermittent front wipers
- Variably Intermittent Wipers
- Vehicle Emissions: LEV II
- Video Monitor Location: Front
- Wheel Diameter: 17
- Wheel Width: 8
- Wheelbase: 114.8"
- Wheels: 17 X 8.0 Silver Aluminum
- Wheels: 20 X 8.0 Gloss Black Painted Aluminum
Seller's Comments
Stylish, capable, and recently serviced, this Diamond Black Crystal Pearlcoat Grand Cherokee Upland delivers V6 power and 4WD confidence. Equipped with heated mirrors, fog lamps, Uconnect 7â touchscreen with Bluetooth, Apple CarPlay/Android Auto, power liftgate, and premium black accents. Clean 1-Owner CARFAX with minor damage reported in 2021, 8 service records, and fresh oil and tire rotation at 91K milesâdependable and ready to explore!
View MoreRTE 50 West, 1569 George Washington Hwy
Grafton, West Virginia 26354
(304) 265-3000
Looking for someone to work with?
View salespeople at this dealershipSimilar Vehicles
**$575 Dock Fee** See dealer for full details.
DealerRater Disclaimer: The information on vehicles provided in this service is supplied by the seller or other third parties; DealerRater is not responsible for the accuracy of such information. DealerRater provides this service and materials without representations or warranties of any kind, either expressed or implied.
Click here for more details.

